← All appsStructCalc.Online / Help

Application guide

WallBermCalc

Retaining-wall, berm, tie and stability checks.

What this tool does

Retaining-wall, berm, tie and stability checks. This guide describes the main workflow, key information and stated limits to review when using the tool.

Application version: v13.

Open WallBermCalcContact support

Set up the wall and berm

  1. Enter wall and footing geometry, retained-side soil layers, groundwater and surface surcharge.
  2. Define berm height, slope and toe dimensions on the passive side. Add base embedment and choose whether toe passive resistance is included.
  3. Enter the optional tie or top-prop stiffness and assumed mobilisation movement, plus any design/check factors.
  4. Run the calculation and review the sketch, pressure resultants, bearing/eccentricity checks and governing wall actions.
  5. Change one assumption at a time to compare the effect of berm geometry, water, surcharge or restraint stiffness.

Model features

Checks and assumptions

The tie force is based on the selected stiffness and assumed movement, so it is a 2D sensitivity check rather than a coupled wall/ground/structure model. Review the passive-resistance assumptions and avoid double-counting toe resistance where berm resistance is active. Independently check global stability, structural capacity, movement, water and construction stages.