Linked project records
Keep appointments, temporary works items, briefs, checks, inspections and permits together.
TW Management
Temporary works records and coordination
Temporary works control and coordination.
Sign in with an approved StructCalc account to use the calculator. This guide is public.
Keep appointments, temporary works items, briefs, checks, inspections and permits together.
Review completeness and status from the records held against each item.
Prepare register, permit and close-out documents from the project data.
New to TW Control? Follow Run a project through the register for the step-by-step workflow. Use Help by topic to find a particular field or control, and read Checks and limits before using the output.
Choose a topic for instructions, field guidance and controls.
Create or open a central project to share records and reserve a project email address. Save central records explicitly; the toolbar Save button keeps a JSON file copy. The Correspondence tab holds drafts and received messages. Live email requires a configured mail service.
Nominate people, collect digital competence forms and appointment acknowledgements under People; review Details and finalise their appointments.
Set up the project, numbering and inspection intervals here; record appointments under People.
Add each temporary works item to the Register and keep its brief, design, check, construction and inspection records inside the item.
Status is derived from the records — the register can never contradict the evidence.
Permits to Load / Unload are gated: the app checks the records before issue, and any override is recorded with a justification in the item log.
All paperwork (register, EDB, check certificate, inspection record, permits, close-out pack) prints from the same data.
Save links a JSON project database for automatic write-back every 10 minutes while the app is open. Send an item fragment to the TWD, merge it back on return.
No matching topics. Try a field name or a word used by the app.
Keep the relevant field guidance open while you work.
Follow these written walkthroughs. Each link opens the full instructions in Help by topic.
No video tutorials have been added for TW Control yet. Use the written guidance above.
TW Control supports record administration and evidence tracking; it does not perform temporary works design or replace the project’s BS 5975 procedures. The Principal Contractor, Designated Individual, Temporary Works Coordinator, designers and checkers remain responsible for competence, approvals, safe systems and statutory duties. Keep exported project files secure and backed up.
Your model, calculation controls and exports stay in the existing calculator.
Launch TW Control